Cooling & Airflow Planning
Format: On-site survey + layout drawings Duration: 1 day survey; drawings within 7 business days Location: On-site in South Korea Pricing: Quote based on suite floor area

Who This Is For

Suite managers seeing rising intake temperatures, uneven row performance, or planning a density increase without adding HVAC capacity.

What You Receive

  • Intake and exhaust temperature map across the suite floor
  • Recommended row spacing and hot-aisle/cold-aisle adjustments
  • Inline fan placement suggestions with CFM targets
  • Ceiling duct modification notes for your HVAC contractor
  • Estimated thermal headroom after recommended changes

Scope

Included: Full-day thermal survey, infrared hotspot log, annotated floor plan, one contractor briefing call.

Excluded: Fan purchase, duct fabrication, HVAC contractor labour.

Process

We measure during normal operating load. Drawings reference your existing rack positions. Implementation remains with your facilities team or contractor.

Next Step

Request a survey date with suite dimensions and current unit count.

Request This Service All Equipment Reviews